The Vinton Municipal Electric Utility (VMEU) is requesting proposals for the following to assist the utility
in building a Fiber-to-the-Premises (FTTP) build-out in Vinton, Iowa. The intent of the Owner is to build
this network in its entirety during the 2019 construction season.
The proposed network will be direct buried, passing approximately 2,200 homes ultimately, and will
require an initial build of approximately 82 miles (40 miles of mainline and 42 miles of drop-line)
composed of fiber optic cable.
The following RFP will be also released to qualified Vendors, subject to acceptable RFQ submissions. All
equipment proposed shall be new, nor re-used or refurbished equipment will be considered acceptable.
1. Miscellaneous Equipment – Bays, cable Racking, installation materials
FARR Technologies will be in charge of all design and construction of the project listed above. All
communications from Vendors shall be routed via the contacts listed below.
FARR Technologies’ Contact information for notice of intent to provide proposals.
Jodi Wilson, Assistant Project Manager
Jodi.wilson@FARRtechnologies.com
Mobile: 605-770-9283
Contacts for technical questions.
Miscellaneous Materials
David Fridley, Partner
Dave.Fridley@FARRtechnologies.com
Mobile: 605-999-1176